What does an unfilled aircraft engineering position actually cost?

A vacant role can cost more than the salary it saves. Karissa Gilchrist explains how to assess cover costs, lost capacity and the capability your roster needs.

Aircraft maintenance engineers working beneath an aircraft in a hangar

Most organisations can put a clear dollar value against an aircraft engineering position: salary, training and employment costs. The cost of having nobody in that position is often less clear.

If a role stays vacant for three months, the salary saved may be one of the least useful numbers in the decision. The work still needs to be done. The gap is usually absorbed by the people already there, temporary cover or work that has to wait.

Before deciding what you can afford to spend on a hire, work out what another eight weeks without that capability will cost.

Hiring delays are a planning issue

Recent Australian recruitment data shows why it is worth planning for a vacancy to last longer than expected.

Australia · September 2026
65%

of employers recruiting technicians and trades workers reported difficulty finding staff.

60%

reported vacancies in those roles remaining unfilled for more than a month.

These figures cover technicians and trades workers across Australian industries, not aircraft engineers alone. Source: Jobs and Skills Australia, September 2026 recruitment results, published 29 October 2026.

In aircraft maintenance, a suitable applicant also needs to match the work: licence category, relevant type capability, experience, authorisations and location. A large applicant pool does not necessarily provide the person your roster needs. Our workforce planning outlook looks at those longer-term pressures.

The work moves somewhere else

Overtime is often the first response. Engineers move between locations, contingent labour is arranged at short notice, and supervisors spend more time reorganising rosters. Experienced staff are pulled away from their usual responsibilities to keep the operation moving.

Those measures may be sensible for a short period. The problem starts when a temporary arrangement becomes the normal way of working.

  • Cover and mobilisation: extra paid hours, contractor invoices, flights, accommodation and allowances.
  • Maintenance capacity: work deferred, work declined or aircraft waiting because the required capability is unavailable.
  • Supervision and planning: time diverted from apprentices, inspections, preparation and improvements.
  • Roster resilience: fewer options when someone takes leave, becomes ill or needs training.

Fatigue also needs a separate assessment. CASA’s human factors guide for engineers explains how fatigue can affect judgement, attention, memory and defect detection. A cost estimate cannot replace fatigue controls or justify an unsafe roster.

Count the capability, not just the people

An organisation may have ten engineers. That does not mean it has ten people who can perform or certify the same work.

An illustrative roster

10 engineering positions. Two cover a particular certification scope.

Leave one of those two positions vacant and half the people covering that scope are missing.

Gold: scope covered · Dashed: vacant · Grey: other engineering positions. This is a hypothetical example, not a claim that total output falls by half.

The effect depends on the fleet, tasks and roster. If the missing person supports a particular aircraft type, holds an essential authorisation or supervises developing engineers, the impact can be much greater than the headcount suggests.

Start with the work that must be done and the people authorised and competent to do it. Then check how much cover remains across shifts, leave and training.

“The value of filling the position is tied to the capability it provides, not simply the hours worked.”

Karissa Gilchrist

Put a cost against the next eight weeks

Use a defined period and compare it with having the position filled. Work from actual costs and realistic demand, rather than a fixed multiple of salary.

Estimated net vacancy cost
Additional cover and mobilisation costs
+ contribution lost from work you cannot complete
− employment costs genuinely avoided

  • Count additional costs. Include overtime and external cover caused by the vacancy, plus related travel and accommodation.
  • Use lost contribution, not the full invoice value. For work you cannot complete, deduct the variable costs avoided, such as materials. Keep the vacant role’s salary saving in the separate line below. Count only the effect attributable to the vacancy.
  • Subtract the genuine saving. Allow for salary and employment costs avoided during the same period.
  • Keep a separate capacity record. Record supervisor time, deferred training and leave pressure. Existing salaried time diverted to cover is not automatically an additional cash expense.

Avoid counting the same impact twice. If a contingent engineer completes the work, do not also count all that work as lost output. Keep recruitment and training costs for the proposed solution separate, so the comparison stays clear.

This gives the business a better basis for deciding whether relocation assistance, planned cover or an internal training pathway is worthwhile.

Choose a response that restores the capability

There is no single answer to every vacancy. The useful comparison is the cost, time and capability each option provides.

  • Recruit for an ongoing requirement. Direct recruitment can provide continuity when the workload is permanent. Define the essential scope, agree the offer range and make time for interviews before advertising.
  • Bridge a defined gap. Contingent aircraft engineers can support leave cover, checks or a recruitment period, subject to availability and the required capability. Agree the duration and handover plan.
  • Develop an engineer you already employ. A training and retention plan may include RPL and gap training, exclusion removal or aircraft type training. Plan the training, experience and authorisation steps alongside roster cover.
  • Build future capacity. Workplace apprentice training needs supervision and time. It will not replace an immediately required LAME, but it can reduce repeated reliance on recruiting scarce skills.

Often the best response combines these options: cover the immediate gap while recruiting or developing permanent capability. Our guide to recruitment versus labour hire explains the practical differences.

Sometimes the required engineer is not available locally. Sometimes the licence or type capability is scarce enough that development will be more effective than another recruitment round. Understanding the cost of the gap helps you decide, without assuming the answer is always to pay more or recruit faster.

What is the gap in your roster costing?

Tell us the aircraft, location, required capability and when you need cover. Sigma Aerospace Workforce can help you compare recruitment and contingent support, and connect you with Sigma Aerospace College where training is part of the answer.

We work within an aircraft maintenance group. The conversation starts with the work you need to complete.

Discuss your workforce requirement

Karissa Gilchrist, Head of Workforce Solutions at Sigma Aerospace